Legal operator: Australian CNC Parts Online is a registered business name of BT Engineering Vic Pty Ltd, ABN 21 654 640 267.

QUALITY FRAMEWORK

Manufacturing and drawing standards

The accepted quote and drawing control every job. These baseline rules remove ambiguity without overriding requirements expressly shown on your order.

01Order of precedence

Unless the quote says otherwise, conflicts are resolved in this order: written quote and approved clarifications; approved drawing; approved 3D model; purchase order; these standards. We will seek clarification where a conflict could materially affect function, price or lead time.

02Drawing approval

The customer must approve the manufacturing revision before production. Approval confirms part number, revision, units, material, quantity, critical dimensions, tolerances, threads, finishes, inspection requirements and intended application. Verbal changes are not effective until confirmed in writing.

03Dimensions and tolerances

Only dimensions and tolerances stated in the accepted specification are guaranteed. If a dimension needed to manufacture the part is missing, we will request clarification or document a proposed assumption for approval. We do not infer precision tolerances from model appearance alone.

Unless otherwise specified, dimensions apply after machining and before coating. The effect of plating, anodising, paint, heat treatment or other finishing on fit must be identified in the drawing or quote.

04Materials and traceability

Material is supplied to the grade shown on the accepted quote. Mill or material certificates and batch traceability are provided only when quoted. No grade substitution affecting the agreed specification will be made without written approval.

05Edges, threads and appearance

Parts are supplied clean and free from loose burrs. Edge breaks, radii, chamfers, thread class, grain direction, cosmetic surfaces and surface-roughness values must be specified where functionally important. Minor witness marks consistent with the agreed process are not defects unless a cosmetic requirement was quoted.

06Inspection

Normal inspection verifies selected dimensions and visible workmanship appropriate to the job. First-article inspection, full dimensional reports, calibrated reports, CMM inspection, certificates of conformity and third-party testing must be requested before quoting. Measurement disputes will be assessed using an appropriate calibrated method and the approved specification.

07Safety-critical applications

Customers must disclose parts intended for lifting, pressure systems, braking, steering, aviation, medical, defence, motorsport safety or other safety-critical use. We may require design verification, engineering certification, additional testing or may decline the work.

Operator: BT Engineering Vic Pty Ltd · ABN 21 654 640 267 · 12 Matchett Drive, East Bendigo VIC 3550 · Governed by the laws of Victoria, Australia.